11-3
11
Wireless Pressurized Line Leak Detection
0.2 gph (0.76 lph) Line Leak Test Scheduling - Option
Press CHANGE and enter the actual line length (rounded up to the next foot). Press ENTER to confirm your
choice, and continue.
If you are using fiberglass, your line length setup will first display the 2.0 inch (50 mm) size:
Enter the actual line length (rounded up to the next foot) and press ENTER. If you are not using 2.0 inch fiberglass
enter 0 and press ENTER. The display shows the 3.0 (76 mm) size:
If you are not using 3.0 inch line, enter 0 and press ENTER. If you are using 3.0 inch line, enter the length and
press ENTER.
NOTE: When using the Fiberglass pipe type, the unused size’s length must be set to zero.
Press STEP to continue.
0.2 gph (0.76 lph) Line Leak Test Scheduling - Option
NOTE: The 0.2 gph Line Leak Test is an optional feature for steel and fiberglass piping types only. This message
will not appear unless the
0.20 Repetitive
WPLLD
software module key is installed in your system.
This feature allows the user to choose the scheduling frequency of the 0.2 gph tests
1
:
•
Disabled - No manual or automatic 0.2 gph testing is allowed.
•
Repetitive - After a dispense, a 3.0 gph (11.3 lph) test is run, followed by a 0.2 gph test. The test blockout
period (selected in Precision Test Duration setup) is then observed. After the test blockout period, the test
sequence repeats after the next dispense. This selection also enables manual 0.2 gph testing.
•
Monthly - At the beginning of every month until a test has passed. This selection also enables manual 0.2 gph
testing.
•
Manual - 0.2 gph tests run only when manually started.
Disabled is the default setting. Press STEP for Disabled, or press CHANGE to select other choices, then press
ENTER. Press STEP to continue.
1. When CSLD is available, all 0.2 gph and 0.1 gph line leak testing is subject to test blockout periods. These
blockouts are imposed to allow CSLD ‘pump off’ time to collect tank leak test data. Precision tests are run on an
every other day basis. In addition, if the last precision test result is a pass, there will be a minimum of 60 hours
before the next test will be attempted. If necessary, the 60 hour blockout period can be extended in the Precision
Test Duration setup [page 5-15].
W1: (WPLLD Line Label)
2.0 iN DIAM. LEN: 501
W1: (WPLLD Line Label)
3.0 iN DIAM. LEN: 351
W1: (WPLLD Line Label)
0.20 GPH TEST: DISABLED