10. Acquiring 3D MODEL Scan Images
122
Green Smart User Manual
6.
Click
CONFIRM
button when exposure parameter setting is completed.
<Console Software> <Touch Screen>
When you click
CONFIRM
button,
The Rotating Unit will move to its initial scanning position.
The Vertical Beam will be activated to make patient positioning easier.
The DAP (Dose Area Product), Scan Time and Exposure Time will be
displayed below the Patient Information window.
7.
Bring the Plaster Cast to the equipment.
Summary of Contents for GREEN SMART
Page 1: ...User Manual Version 1 23 English...
Page 2: ......
Page 3: ......
Page 4: ......
Page 52: ...5 Imaging Software Overview 44 Green Smart User Manual Left blank intentionally...
Page 90: ...7 Acquiring PANO Images 82 Green Smart User Manual Left blank intentionally...
Page 110: ...8 Acquiring CEPH Images Optional 102 Green Smart User Manual Left blank intentionally...
Page 126: ...9 Acquiring CBCT Images 118 Green Smart User Manual Left blank intentionally...
Page 134: ...10 Acquiring 3D MODEL Scan Images 126 Green Smart User Manual Left blank intentionally...
Page 142: ...12 Cleaning and Maintenance 134 Green Smart User Manual Left blank intentionally...
Page 144: ...13 Disposing of the Equipment 136 Green Smart User Manual Left blank intentionally...
Page 154: ...14 Technical Specifications 146 Green Smart User Manual Left blank intentionally...
Page 185: ...15 Appendices Green Smart User Manual 177 ENGLISH...
Page 200: ......