TRANSPORTATION AND INSTALLATION MANUAL
7
Table of Contents
Page
Equipment Configuration Drawing (For the TSL3100) .............................. 11
Equipment Configuration Drawing (For the TSL3100E) ........................... 12
Equipment Configuration Drawing (For the TS3100) ................................ 13
Unpacking (for the TSL3100,TSL3100E) ............................................................ 19
Storage Precautions for the Robot ........................................................... 27
Storage Precautions for the Controller ..................................................... 27
Change of Axis-1 Working Envelope ........................................................ 39
Change of Axis-2 Working Envelope ........................................................ 43
Change of Axis-3 Working Envelope ........................................................ 49
Precautions for Handling the Teach Pendant ...................................................... 54
Installing the Controller(In case of TSL3100) ................................................ 55