
3-22
Z Master 500 Gas Series Service Manual
3
CHASSIS
9. Remove the cotter pin and clevis pin through the
adjustable yoke for the neutral return bolt (Fig. 096).
10. Remove the two bolts and nuts that retain the flange
bearing on the inside of the motion control (Fig.
097).
Fig 096
DSC-2064
Fig 097
DSC-2066
11. Remove the two bolts and nuts that retain the flange
bearing on the outside of the motion control (Fig.
098).
12. Remove the motion control from the frame (Fig.
099).
Fig 098
DSC-2067
Fig 099
DSC-2068
Reverse the order of removal.
Motion Control Assembly Installation
Summary of Contents for Z Master 500 Series
Page 1: ...Z Master 500 Series Gasoline Engine Models Service Manual LCE Products...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 7: ...iv Z Master 500 Gas Series Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK...
Page 115: ...5 44 Z Master 500 Gas Series Service Manual 5 ENGINE THIS PAGE INTENTIONALLY LEFT BLANK...
Page 133: ...6 18 Z Master 500 Gas Series Service Manual 6 Kohler EFI Electric Fuel Injection ELECTRICAL...
Page 136: ...6 21 Z Master 500 Gas Series Service Manual 6 Kawasaki L C Liquid Cooled ELECTRICAL...
Page 137: ...6 22 Z Master 500 Gas Series Service Manual 6 ELECTRICAL THIS PAGE INTENTIONALLY LEFT BLANK...
Page 167: ...Z Master 500 Series Gasoline Engine Models Service Manual Form No 492 9151...