![Thermo Scientific LTQ XL Getting Started Download Page 53](http://html.mh-extra.com/html/thermo-scientific/ltq-xl/ltq-xl_getting-started_1105110053.webp)
2
Setting Up the Ion Source for Tuning and Calibrating the MS Detector
Installing the ESI Probe
Thermo Electron Corporation
LTQ XL Getting Started
41
8. Insert the stainless steel ZDV fitting (grounding union) into the
grounding bar on the ion source housing. See
Figure 15.
Ion Max ion source housing with ESI probe installed
9. Connect the sheath gas fitting (blue) to the sheath gas inlet (S) on the
probe. (See
10. Connect the auxiliary gas fitting (green) to the auxiliary gas inlet (A) on
the probe. (See
.)
11. Connect the 8 kV cable to the ESI needle high voltage receptacle on the
ESI probe. Tighten the locking ring on the 8 kV connector.
12. Connect the sample transfer tubing to the grounding union.
The ESI probe is now properly installed in the Ion Max ion source housing.
Leave the LC/MS system in Standby and go to
Calibrating Automatically in the ESI/MS Mode”
.
ESI Interlock
Socket
Grounding Bar
Grounding Union
PEEK Safety
Sleeve
Auxiliary Gas Inlet (A)
8 kV Cable
Sheath Gas Inlet (S)
Sample Inlet