Operation
Calibration
3-14
49iQ Instruction Manual
Thermo Scientific
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
●
Zero/Span Schedule:
Toggles zero/span schedule Enabled or Disabled.
●
Next Time:
Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
●
Period:
Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
●
Zero Duration:
Sets how long zero air is sampled by the instrument.
●
Ozonator Level 1
6 Duration:
Sets the time duration for ozonator level
1
6.
●
Purge Duration:
Sets how long the purge period will be at the end of
the schedule.
Zero/Span Schedule
Summary of Contents for 49iQ
Page 1: ...49iQ Instruction Manual Ozone Analyzer 117433 00 1Sep2019 ...
Page 2: ......
Page 8: ......
Page 20: ......
Page 36: ...Operation Instrument Display 3 8 49iQ Instruction Manual Thermo Scientific ...
Page 168: ......
Page 242: ......
Page 260: ......
Page 268: ......
Page 280: ......
Page 281: ......