Installation and Setup
Setup Procedure
2-6
49iQ Instruction Manual
Thermo Scientific
Use the following procedure to setup the instrument:
1.
Connect the sample line to the SAMPLE
bulkhead on the rear panel
(
Figure 2–5
). Ensure that the sample line is not contaminated by dirty,
wet, or incompatible materials. All tubing should be constructed of
PTFE, 316 stainless steel, borosilicate glass, or similar tubing with an
OD of 1/4-inch and a minimum ID of 1/8-inch. The length of the
tubing should be less than 10 feet.
Note
Gas must be delivered to the instrument free of particulates. It may
be necessary to use the PTFE particulate filter as described in “
PTFE
Particulate Filter
” on page
9-17
.
▲
Note
Gas must be delivered to the instrument at atmospheric pressure. It
may be necessary to use an atmospheric bypass plumbing arrangement as
shown in
Figure 2–6
if gas pressure is greater than atmospheric pressure.
▲
2.
Connect the
EXHAUST bulkhead to a suitable vent. The exhaust line
should be 1/4-inch OD with a minimum ID of 1/8-inch. The length of
the exhaust line should be less than 10 feet. Verify that there is no
restriction in this line.
3.
Connect a suitable recording device to the rear panel connector. For
detailed information about connecting to the instrument, refer to:
“
Connecting External Devices
” on page
9-1
Communications > “
Analog I/O
” on page
3-89
and “
Digital I/O
”
on page
3-90
.
4.
Plug the instrument into an outlet of the appropriate voltage and
frequency.
The 49iQ is supplied with a three-wire grounding cord. Under no
circumstances should this grounding system be defeated.
▲
Setup Procedure
Icon Here
Summary of Contents for 49iQ
Page 1: ...49iQ Instruction Manual Ozone Analyzer 117433 00 1Sep2019 ...
Page 2: ......
Page 8: ......
Page 20: ......
Page 36: ...Operation Instrument Display 3 8 49iQ Instruction Manual Thermo Scientific ...
Page 168: ......
Page 242: ......
Page 260: ......
Page 268: ......
Page 280: ......
Page 281: ......