21
Maintenance Inspection Schedule
Pretrip
Every
1,500
Hours
Every
3,000
Hours*
Annual/
4,500
Hours
Inspect/Service These Items
Microprocessor
•
Run Pretrip Test (see “Pretrip Tests” in the Operating Manual).
Engine
•
Check fuel supply.
•
Check engine oil level.
•
•
•
•
Inspect belts for condition and proper tension (belt tension tool
No. 204-427).
•
•
•
•
Check engine oil pressure hot, on high speed (should display “OK”).
•
•
•
•
Listen for unusual noises, vibrations, etc.
•
Check air cleaner restriction indicator (change filter when indicator
reaches 25 in.). Replace EMI 3000 air cleaner element (see “EMI 3000
Air Cleaner Assembly” on page 93) at 3,000 hours or two years
(whichever occurs first) if indicator has not reached 25 in.
•
•
•
Drain water from fuel tank and check vent.
•
•
•
Inspect/clean fuel transfer pump inlet strainer (prefilter).
•
•
•
Check and adjust engine speeds (high and low speed).
•
•
•
Check condition of drive coupling bushings per Service Bulletin T&T 171.
•
Check engine mounts for wear.
•
Replace fuel filter/water separator.
•
Change engine oil and oil filter (hot). Requires oil with API Rating CG-4 or
better (ACEA Rating E2-96 for Europe).
—
Change ELC (red) engine coolant every 5 years or 12,000 hours. Units
equipped with ELC have an ELC nameplate on the expansion tank (see
page 77).
—
Test fuel injection nozzles at least every 10,000 hours.
Electrical
•
•
•
Inspect battery terminals and electrolyte level.
•
•
•
Inspect wire harness for damaged wires or connections.
•
•
•
•
Check operation of damper door (closes on defrost initiation and opens
on defrost termination).
•
Inspect alternator wire connections for tightness.
•
Inspect electric motor, replace bearings yearly or every 6,000 hours.
*3,000 hours or two years, whichever occurs first.
Summary of Contents for SB-210
Page 4: ...4 ...
Page 12: ...List of Figures 12 ...
Page 31: ...Unit Description 31 Unit Photos Figure 6 Front View AJA1617 ...
Page 36: ...Unit Description 36 ...
Page 49: ...Operating Instructions 49 Figure 32 Viewing Sensors Screen Sequence ...
Page 54: ...Operating Instructions 54 Figure 40 Datalogger Screen Sequence ...
Page 101: ...Engine Maintenance 101 ...
Page 102: ...Engine Maintenance 102 ...
Page 140: ...Electric Standby Diagnosis 140 ...
Page 150: ...Index 150 ...
Page 152: ...Wiring Diagram Index 152 ...
Page 153: ...153 Model 30 and 50 Schematic Diagram Page 1 of 3 ...
Page 154: ...154 Model 30 and 50 Schematic Diagram Page 2 of 3 ...
Page 155: ...155 Model 30 and 50 Schematic Diagram Page 3of 3 ...
Page 156: ...156 Model 30 and 50 Wiring Diagram Page 1 of 4 ...
Page 157: ...157 Model 30 and 50 Wiring Diagram Page 2 of 4 ...
Page 158: ...158 Model 30 and 50 Wiring Diagram Page 3 of 4 ...
Page 159: ...159 Model 30 and 50 Wiring Diagram Page 4 of 4 ...