Operating Instructions
64
Time Display
View the time and date as follows:
1. Start at the Standard Display. If the
Temperature Watch Display is showing, press
the
M
ENU
soft key once to return to the
Standard Display.
2. Press the
M
ENU
soft key on the Standard
Display.
3. Press the
N
EXT
soft key until the Time Display
appears.
4. Press the
S
ELECT
soft key to view the time and
date.
Loading Procedure
1. Make sure the unit is turned off before
opening the doors to minimize frost
accumulation on the evaporator coil and heat
gain in the trailer. (Unit may be running when
loading the trailer from a warehouse with door
seals.)
2. Spot check and record load temperature while
loading. Especially note any off-temperature
product.
3. Load the product so that there is adequate
space for air circulation completely around the
load. DO NOT block the evaporator inlet or
outlet.
4. Products should be pre-cooled before loading.
Thermo King transport refrigeration units are
designed to maintain loads at the temperature
at which they were loaded. Transport
refrigeration units are not designed to pull hot
loads down to temperature.
Post Load Procedure
1. Make sure all the doors are closed and locked.
2. Start the unit if it was shut off to load (see
3. Make sure the setpoint is at the desired setting.
4. One-half hour after loading, manually initiate
a Defrost cycle. If the evaporator coil sensor
temperature is below 45 F (7 C), the unit will
Defrost. The microprocessor will terminate
Defrost automatically when the evaporator
coil temperature reaches 58 F (14 C) or the
unit has been in the Defrost mode for 30 or 45
minutes (depending on setting).
Post Trip Checks
1. Wash the unit.
2. Check for leaks.
3. Check for loose or missing hardware.
4. Check for physical damage to the unit.
1.
Standard Display
2.
Menu Soft Key
Figure 57: Time and Date Screens
2
1
Summary of Contents for SB-210
Page 4: ...4 ...
Page 12: ...List of Figures 12 ...
Page 31: ...Unit Description 31 Unit Photos Figure 6 Front View AJA1617 ...
Page 36: ...Unit Description 36 ...
Page 49: ...Operating Instructions 49 Figure 32 Viewing Sensors Screen Sequence ...
Page 54: ...Operating Instructions 54 Figure 40 Datalogger Screen Sequence ...
Page 101: ...Engine Maintenance 101 ...
Page 102: ...Engine Maintenance 102 ...
Page 140: ...Electric Standby Diagnosis 140 ...
Page 150: ...Index 150 ...
Page 152: ...Wiring Diagram Index 152 ...
Page 153: ...153 Model 30 and 50 Schematic Diagram Page 1 of 3 ...
Page 154: ...154 Model 30 and 50 Schematic Diagram Page 2 of 3 ...
Page 155: ...155 Model 30 and 50 Schematic Diagram Page 3of 3 ...
Page 156: ...156 Model 30 and 50 Wiring Diagram Page 1 of 4 ...
Page 157: ...157 Model 30 and 50 Wiring Diagram Page 2 of 4 ...
Page 158: ...158 Model 30 and 50 Wiring Diagram Page 3 of 4 ...
Page 159: ...159 Model 30 and 50 Wiring Diagram Page 4 of 4 ...