Maintenance
6- 26
1705A Spectrum Monitor
FRONT
J1
J3
J2
J4
Ground strap
Remove these screws to remove this board
Figure 6-12: Removing the Power Supply board
1.
Unplug the interconnecting plug from the right side of the LNB power
supply.
2.
Remove the two Torx screws securing the circuit board to the rear panel.
See Figure 6-13.
3.
Remove the circuit board.
4.
Replace the circuit board by reversing the procedure.
BESCHLEUNIGUNGSSPANNUNG KLEINER ALS
20kV
DIE IN DIESEM GERAT ENTSTEHENDE
RONTGENSTRAHLUNG IST AUSREICHEND ABGESCHIRMT
TO AVOID ELECTRICAL SHOCK, THE POWER
CORD PROTECTIVE GROUNDING CONDUCTOR
MUST BE CONNECTED TO EARTH GROUND.
SPECTRUM MONITOR
70 MHz
INPUT
L-BAND
INPUT
LNB POWER
LNB POWER
ON
OFF
+18VDC@250mA
ON
WARNING
0.70 MAX
50/60Hz
90 - 250V REPLACE FUSE ONLY
WITH
250V 2A F TYPE
333--3990--01
Remove these screws to remove
LNB Power Supply board (A4) or to
replace LNB LED.
Figure 6-13: Mounting screws for the LNB Power Supply circuit board, A4
Removing the LNB Power
Supply Board
Summary of Contents for 1705A
Page 13: ...Service Safety Summary xii 1705A Spectrum Monitor ...
Page 17: ...Preface xvi 1705A Spectrum Monitor ...
Page 18: ...Introduction ...
Page 19: ......
Page 38: ...Operating Instructions ...
Page 39: ......
Page 61: ......
Page 62: ...Installation ...
Page 63: ......
Page 72: ...Theory of Operation ...
Page 73: ......
Page 93: ...Theory of Operation 4 20 1705A Spectrum Monitor ...
Page 94: ...Checks and Adjustments ...
Page 95: ......
Page 123: ...Checks and Adjustments 5 28 1705A Spectrum Monitor ...
Page 124: ...Maintenance ...
Page 154: ...Options ...
Page 155: ......
Page 158: ...Replaceable Electrical Parts ...
Page 159: ......
Page 189: ...Replaceable Electrical Parts 8 30 1705A Spectrum Monitor ...
Page 190: ...Diagrams Circuit Board Illustrations ...
Page 191: ......
Page 193: ......
Page 213: ......
Page 214: ...Replaceable Mechanical Parts ...
Page 215: ......
Page 223: ......