TATSUNO
EUROPE
a.s.,
www.tatsuno
‐
europe.com
156
6.1.1.
MAINTENANCE
OF
DISPENSER
COVERS
Covers
of
the
dispenser
(“body
parts”)
made
of
painted
steel
or
stainless
steel
require
regular
maintenance.
Pay
special
attention
to
the
maintenance
of
such
parts
particularly
in
winter
season
when,
due
to
the
activity
of
aerosols
from
chloride
agents
created
from
salts
used
for
road
maintenance,
the
paint
of
unprotected
body
parts
may
be
permanently
damaged,
or
inter
‐
crystal
corrosion
may
appear
in
case
of
stainless
‐
steel
covers.
Recommended
maintenance
of
painted
covers:
Wash
them
with
warm
water
at
least
twice
per
month
(according
to
the
level
of
fouling)
At
least
once
a
month
or
after
each
higher
surface
fouling
with
fuels
–
wash
them
with
detergent,
thoroughly
clean
the
covers
from
salt
residues,
dust,
and
grease
(according
to
the
level
of
fouling)
+
restore
the
protective
coating
on
design
parts
(car
cosmetics).
WARNING
It
is
forbidden
to
clean
the
painted
parts
of
the
dispenser
with
chlorine
‐
based
products!!!
Chlorine
‐
containing
products
(disinfectants
such
as
SAVO)
cause
corrosion
of
metal
parts
of
the
dispenser.
Recommended
maintenance
of
stainless
covers:
Wash
them
with
warm
water
at
least
twice
per
month
(according
to
the
level
of
fouling)
At
least
once
a
month
or
after
each
higher
surface
fouling
with
fuels
–
wash
them
with
warm
water,
thoroughly
clean
the
covers
from
salt
residues,
dust,
and
grease
(according
to
the
level
of
fouling)
+
restore
the
protective
coating
on
design
parts
by
using
a
special
agent
for
stainless
sheet
metal.
RECOMMENDATION
We
recommend
the
following
protective
agents
and
detergents
for
stainless
sheet
metal:
‐
ULTRAPUR
–
d
(producer:
MMM
‐
Group,
Germany)
‐
NEOBLANK
spray
(producer:
Chemische
Fabrik
GmbH,
Hamburg,
Germany)
‐
ANTOX
Surface
Care
800
S
(producer:
Chemetall
AG,
Switzerland)
WARNING
Do
not
wash
stainless
steel
covers
with
detergent
and
chlorine
‐
based
products!!!
6.1.2.
MAINTENANCE
OF
THE
CNG
DISPENSER/MODULE
The
maintenance
schedule
for
the
CNG
dispenser/module
is
described
in
the
table
below:
Table
37
‐
Maintenance
schedule
for
the
CNG
dispenser/module
(according
to
ISO
16923)
Maintenance
activity
weekly
monthly
6
months
Inspection
of
filling
end
piece
damage
X
Inspection
of
hose
damage
X
Visual
inspection
of
the
breakaway
coupling
X
Tightness
test
of
the
filling
end
piece
X
Tightness
test
of
the
breakaway
coupling
X
Tightness
test
of
pipeline
systems
and
threaded
joints
X
Conductivity
test
of
the
set
of
breakaway
coupling
‐
hose
‐
end
piece
X