TATSUNO
EUROPE
a.s.,
www.tatsuno
‐
europe.com
134
5.2.
DISPENSER
COMMISSIONING
ON/OFF
switching
of
fuel
dispensers
is
carried
out
in
the
main
switchboard
of
the
fuel
station
where
the
power
supply
of
the
dispensers
is
provided.
Each
dispenser
has
two
power
points
in
the
main
switchboard:
The
power
supply
of
pump
electric
motors
and
suction
vacuum
pumps
if
included
in
the
dispenser
Power
supply
of
the
dispenser
electronic
counter,
switching
and
heating
circuits
Both
power
points
are
secured
by
the
circuit
breakers
that
enable
the
dispenser
to
be
switched
on/off.
RECOMMENDATION
We
recommend
that
you
turn
on
the
dispenser
as
follows:
Turn
on
the
backup
UPS
located
in
the
kiosk
(the
green
LED
on
the
UPS
turns
on)
Switching
on
the
230
V
circuit
breaker
for
stabilized
power
supply
of
the
dispenser
counter
(all
segments
of
the
display
are
automatically
tested
and
the
last
delivered
values
are
displayed)
Switching
on
the
3x400
V
the
power
supply
circuit
breaker
for
electric
motors
of
pumps
and
vacuum
pumps
(if
installed).
The
following
processes
occur
when
the
power
of
the
PDEX5
counter
is
turned
on
:
test
of
display
units
(displays).
The
backlight
of
the
displays
lights
up
and
then
all
display
segments
are
displayed
(eights))
for
approx.
1
second
time
delay
when
the
counter
is
switched
on.
Time
required
to
start
the
multimedia
display.
During
the
time
delay,
the
displays
show
the
filling
point
to
which
the
display
is
connected
A,
B,
C
or
D
and
the
time
in
seconds
remaining
until
the
electronic
dispenser
counter
is
activated.
The
length
of
the
time
delay
(15)
can
be
set
by
the
counter
parameter,
by
default
it
is
without
delay.
The
positions
of
switches
SW1
‐
1,
SW1
‐
2,
SW1
‐
3
and
SW1
‐
4
are
displayed
on
the
unit
price
line
(1=ON;
0=OFF).
If
switch
SW1
‐
1
is
in
position
1,
then
the
selected
metrological
parameters
cannot
be
set
on
the
counter.
processor
unit
test.
Ten
‐
second
test
in
which
all
functions
and
memory
of
the
processor
unit
are
checked.
During
the
test,
the
side
of
the
counter
to
which
the
display
is
connected
(A,
B,
C
or
D)
is
displayed,
and:
‐
version
of
the
metrologically
relevant
part
of
the
program
(VER
1.02),
‐
checksum
of
the
metrologically
relevant
part
of
the
program
(dbd2
2FA4).
‐
processor
board
type
PDE5S
or
PDE5L
setting
the
counter
status
before
switching
it
off.
The
information
that
would
appear
on
the
display
before
the
counter
was
last
turned
off
is
displayed.
If
the
counter
was
operating
in
manual
mode,
then
it
is
possible
to
start
pumping
immediately
after
picking
up
the
gun.
If
the
counter
was
operating
in
automatic
mode,
it
waits
for
communication
with
the
control
computer
to
be
established
and,
if
necessary,
for
the
transaction
to
be
terminated
(payment),
if
it
was
not
terminated
regularly
before
switching
off.
8888888
1888888
88888
A15
1000
VER
102
1000
A4
0
PDE5S
1000
300.0
10.00
30.00
dbd2
FFA4
1000