PRO CAN PUMP DUAL (PRO-CPD20)
Rev 1.6
2023/07/31
72/95
Copyright
©
2023 by TAEHA CORP. All Rights Reserved
8.2
Check and Actions
Checklist
Cycle
What to check and what to do
Remarks
Environment
Occasional
Please confirm that it meets the usage standards of
the equipment.
Power supply
voltage
Occasional
Please check if the power is AC220V, 50/60Hz.
Appearance of
equipment
Routine
Check that the connection part(connector, terminal
block, etc.) is loose, and firmly tighten the loose
parts.
Calbes
Routine
Please check if there is peeling or severe bending of
the sheath.
Internal state of
equipment
Routine
Maintain the cleaning status so that it does not cause
interference with equipment operation due to
contamination of dust or coating liquid.
Supply air
Occasional
Check that there is no piping connection, joint, or
leakage so that the supplied air maintains normal
pressure.
Purge status
Occasional
If you stop the machine for more than 10 minutes,
please dispense a certain amount of fluid according
to the set time so that hardening does not occur at
the end of the valve.
Other checks
Routine
- Fastening condition of fasteners and fasteners in
equipment
- Wiring fastening and fastening state
- Arrangement and arrangement around equipment