Heat effect
Hoisting ropes exposed to an extremely high heat effect can be detected through faded colors of
outer wires. Such hoisting ropes must be replaced.
Service life
If adequate knowledge and operational experience are available for a rope drive, the time for re‐
placing a hoisting rope can be determined for a mobile crane within the scope of a preventive main‐
tenance provided the operating conditions and the hoisting rope remain the same.
The hoisting rope must be checked regularly.
4.4.2 Replacing a hoisting rope
WARNING
Incorrect hoisting rope has been fixed.
An incorrect hoisting rope may rip, break or cause damage to the rope
drive of the mobile crane. The load may fall. This may result in acci‐
dents involving material damage or personal injuries.
1. When laying a new hoisting rope, only use a hoisting rope having
the same strength, the make and the nominal diameter as that of
the original hoisting rope when it was new.
⇨ If other rope type is to be used, a prior written consent of TADANO
is essential.
Utmost care must be taken when unloading, transporting and
storing the hoisting ropes. The hoisting rope must be protect‐
ed against mechanical damage due to fork-lift truck prongs or
lifting hooks when unloading and transporting.
Hoisting ropes stored as reserve must be stored in a clean, cool, dry and covered room such that
they do not come in contact with the ground, e.g. on pallets.
When mounting a new hoisting rope, it must be implicitly en‐
sured that the new hoisting rope is wound up on the winch
without twists and damage. It is most practical to use a rotary
disc or a rack for winding up a hoisting rope delivered in the
ring or on a winch.
When winding from the winch to the drum, it must be ensured
that the same bending direction is maintained for the hoisting
rope.
Rope windings should never be pulled sideways from the ring or the winch since this may lead to
twists in the hoisting rope.
4 Crane testing instructions
ATF 130G-5 2146097
2014-09
481
Summary of Contents for ATF 130G-5
Page 2: ......
Page 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Page 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Page 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Page 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Page 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Page 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Page 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Page 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Page 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Page 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Page 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Page 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Page 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Page 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Page 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Page 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Page 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Page 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Page 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Page 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Page 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Page 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Page 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Page 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Page 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Page 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Page 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Page 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Page 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Page 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Page 522: ......
Page 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Page 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Page 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Page 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Page 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Page 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Page 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Page 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Page 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Page 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Page 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...