9
C H A P T E R
2
Hardware Installation
This chapter provides information on the initial hardware installation procedure,
including installing modules and external I/O connections.
Unshipping and Mounting the System
Once you have removed the packaging from the system, you must then unship the
system from the delivery pallet and brackets before attempting to mount the chassis
in a rack.
Caution –
Do not attempt to remove the red plinth before the chassis has been
mounted in the rack.
There is an instruction card attached to the front of the system; the instructions
below are intended to supplement this.
Note –
Do not discard the packaging after removing it from the system. It should be
stored in safe, dry place so it can be used in the event that the system requires
moving or returning for repair.
Tools
The tools required to unship the system are contained in a cloth bag attached to the
chassis.
Summary of Contents for Netra ft 1800
Page 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Page 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Page 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Page 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Page 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Page 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Page 56: ...42 Netra ft 1800 Installation Guide February 1999 ...