Netra ft 1800 Installation Guide • February 1999
Depth
The front door (if fitted) must provide a minimum of 75 mm (3 inches) of clearance
across the entire front surface of the Netra ft 1800 to allow for routing of I/O cables.
As all I/O cables must be routed from the front of the Netra ft 1800 system, due
consideration should be made of the space required within the rack for these cables,
as well as the power cables at the rear of the system.
There must be a minimum of 545 mm (21.5 inches) usable internal depth in the rack/
cabinet. This dimension includes space for connector housings, cabling and the
power inlet filters.
Safety
All racks must be bolted to the floor, to adjacent frames or to both. This must be
done in accordance with the rack manufacturer’s instructions, using the
recommended hardware and fixings.
Free-standing racks with a footprint of less than 600 mm x 600 mm (23.6 inches x
23.6 inches) are likely to be unstable and should be treated with caution.
Summary of Contents for Netra ft 1800
Page 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Page 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Page 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Page 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Page 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Page 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Page 56: ...42 Netra ft 1800 Installation Guide February 1999 ...