74
Netra ft 1800 Installation Guide • February 1999
environmental considerations, 1
environmental filters, installing, 37
Ethernet address, 60
F
filter replacement kit, 3
filters, installing, 37
flanges, See mounting flanges
frame ground, 49
G
GR 63 Core heat release calculation result, 2
grounding
connections, 51
dual, 48
isolation, 49
materials required, 48
requirements, 48
H
hard disk drive
name for Volume Manager, 66
hardware installation, 9
heat release
GR 63 Core calculation result, 2
maximum rate of, 2
hostname, 60
humidity, limitations for operating and storage, 2
I
I/O connections, 38
injector/ejector mechanism, 23
disk chassis, RMM chassis, 30, 32
installation methods, 58
installation, electricity supply, 43
IP address, 60
L
LD_LIBRARY_PATH
environment variable, 63
local installation
procedure, 58
requirements, 58
location, considerations, 1
logic ground, 49
M
machine name, 60
modem port
parameters, 39
pinout, 40
modules
injector/ejector mechanism, 23
mounting configurations, 6
mounting flanges
19-inch, 14
23-inch, 18
24-inch, 18
600mm, 18
description, 6
sizes, 13
mounting kit
19-inch, 13
23-inch, 18
24-inch, 18
600mm, 18
mounting platform, 12
mounting plinth, 12
mounting requirements, 6
mounting screws, 6
N
name service, 60
netmask, 60
network installation
requirements, 59
NVRAMRC
, specify boot disk aliases, 72
Summary of Contents for Netra ft 1800
Page 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Page 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Page 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Page 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Page 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Page 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Page 56: ...42 Netra ft 1800 Installation Guide February 1999 ...