108
Sun Enterprise Tape Library 7/3500 Field Service Manual • July 1997
Note –
Take note of the wire and connector orientation exiting the solenoid before
disassembling.
11. With the solenoid plunger on a firm surface, press out the pivot pin.
▼
To Replace the Load Port Door Lockout Solenoid
●
Follow the removal instructions in reverse order.
Note –
Special attention should be paid to the coil orientation of the pin when
reinstalling.
▼
To Make Adjustments Required After Replacement
●
Auto calibrate load port.
Summary of Contents for Enterprise Tape Library 7/3500
Page 10: ...x Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 26: ...xxvi Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 28: ...xxviii Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 76: ...46 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 118: ...88 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 192: ...162 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 231: ...Glossary 3 ZIF connector Zero insertion force connector ...
Page 232: ...4 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 242: ...10 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...