23
C H A P T E R
2
Preventive Maintenance
This chapter provides guidelines and procedures for aligning, adjusting, cleaning,
and lubricating specific components of the library.
Caution –
All preventative maintenance procedures must be performed by an
authorized field service engineer (FSE).
Preventive Maintenance Schedule
Preventive maintenance (PM) for the library should only be performed by an
authorized field service engineer (FSE).
TABLE 2-1
lists the type of PM required by the
library and specifies the maximum time frame between preventive maintenance.
Note –
The first FSE PM is performed during initial installation.
TABLE 2-1
Preventive Maintenance Guidelines
PM Required
Maximum Time Frame
Cleaning and lubricating the rails and rollers
every 12 months
Cleaning and lubricating the gripper assembly
every 12 months
Checking and adjusting belt tensions and rollers
every 12 months
Cleaning the fan filter
every 12 months
Cleaning the tape drives
every 12 months
Summary of Contents for Enterprise Tape Library 7/3500
Page 10: ...x Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 26: ...xxvi Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 28: ...xxviii Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 76: ...46 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 118: ...88 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 192: ...162 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 231: ...Glossary 3 ZIF connector Zero insertion force connector ...
Page 232: ...4 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...
Page 242: ...10 Sun Enterprise Tape Library 7 3500 Field Service Manual July 1997 ...