pressure and conveyor parts, in order to easy maintenance and protect operator
’
s
security.
3.2.3:
Terminal Illustration
Below are the terminals inside the control panel of soldering system. The user should
proceed the wiring as per the Electric Layout.
3.2.4:
Standard Wiring
The user should provide the AC power supply with 3 phases, 5 wires, 380V and 50Hz and
every phase should apply to 80A and connects with 16mm
2
wires of 5 cores. The cable that is
marked with No., will fix on the XP terminals through the inlet. The copper wire should
connect with the terminals and tighten the copper wire with pincers. Please refer to the above
sketch. The soldering system will not work and the screen of computer will display the warning
signals of phase missing or phase wrong if 1 phase or 2 phases has not connected with power
supply or the sequence of 3 phases is incorrect. Check if the voltage of 3 phases is proper or
exchange the sequence of 3 phases for double check after turning off the power supply.