SUN EAST PEAK-350
电脑波峰焊用户手册
49 -74
Finger: The finger cleaning system.
Lightening: The headlamp inside the machine.
Main Air Valve: The valve for sprayer system.
Exhaust Fan: The waste air exhaust fan for sprayer system.
Dynamic Power: The switch of main dynamic power supply.
Automatic Flux Supply: Sprayer motor supplying the flux automatically.
Hot air fan: The preheat hot air cycle transfer. .
For example,
1
.
Press
“
OFF
”
button of AutoStart and the machine will not run under the automatic mode
and its indicator light blacks out.
2
.
Press
“
ON
”
button on Solder Pot, and the solid solder in the solder pot will be melt by
heating.
3
.
Go to the next step after the temperature of solder pot reaches to the setup value and be
sure that all solid solder have melted into liquid one.
4
.
Adjust the width and angle of lead rail as required.
5. Press
“
ON
”
button of Preheat.
6. Press
“
ON
”
button of Conveyor System.
7.
Press
“
ON
”
button of Cooler.
8.
Press
“
ON
”
button of Finger Cleaner.
9.
Press
“
ON
”
button of Main Air Valve.
10.
Press
“
ON
”
button of Sprayer Motor and Wave Motor if necessary.
11.
Press
“
ON
”
button of Lightening if necessary
12.
Be sure that the preheating temperature, conveying speed, temperature of solder pot,
height of wave, inclining angle, spraying speed etc. can meet the needs of soldering
techniques.
13.
Start soldering the PCB. Switch off the relevant parts in the system after completion of
soldering.
4.6 Automatic Operation
1
.
Be sure that all parameters are set up properly.
2
.
Press
“
Control Panel
”
menu on main menu or press the icon of
“
Control Panel
”
to
show its dialog box. Press
“
ON
”
button of Automatic Mode and its green light will
be enlightening. The solder pot will be heated on basis of the preset value on inner
timer. The green light of Solder Pot on Control Panel will be enlightened when the
solder pot is being heating. Press
“
ON
”
button of Automatic Start, and its green
light will be enlightened, and then the soldering system will run automatically.