1.3 Main Parts and its Function
Function introduction:
PCB will go into the conveyor from the buffer. The sprayer will spray the flux on
the bottom of PCB and the PCB goes into the pre-heater. The solder pot will solder the PCB to weld the
components strongly with the basic board and then the PCB will go into the cooler. At last, the PCB will
output from the conveyor. The whole process is under the control of control system and all parameters can be
preset on the display.
1.4 Operation Precaution
1.4.1 Safety Precaution
1.
Switch off the power supply before connecting or disconnecting the wires on terminal of
power supply, terminals of earth wire, and terminals of control circuit.
2.
Do not touch the terminals of control panel or the joints of outer components even if the
machine stops but the system can be set automatically switch and the outer power turns on.
Switch off the power supply before checking the machine stopping.
3.
Be sure that the grounding is in good condition.
4.
Be sure that the power supply has been switched off at least for 5 minutes before checking
the inner components because some devices such as inverter, UPS, DC power and driver etc
may under the high voltage.
5.
Switch off the power supply if there is no necessity to use the machine for a long time.
Otherwise, it may result in malfunction or electric shock.
6.
Be sure that the rated voltage is equal to that of AC power before switching on the power
supply. Otherwise, it may result in malfunction, components broken or fire.