SUN EAST PEAK-350
电脑波峰焊用户手册
29 -74
Check if the power supply is under the rated voltage, rated currency, 3 phases and 5 wires.
Check if the main powers are connected with the machine.
Check if the machine is grounded.
Check if there are any sundries in the control panel and all plugs are in good connection.
Check if the stop button on the entrance and exit is flicked up.
Check if UPS can work normally.
Be sure that the exhaust pipe is connected with the main vent-pipe in plant.
Check the lubrication of all driven bearings.
Check if the conveyor chain is not in order after transportation.
Check if the screws on chain wheel and gear wheel of conveyor are tightened.
Check if the chain can run normally and it is not squeezed and block. Be sure that the
chain is connected with the wheel and it cannot fall off.
Clean the solder pot and do not put anything irrelevant into the machine.
Check if the preset temperature is applicable to the PCB and the lead-free solder being
chosen (Refer to Instruction book on Solder) before switch on the pre-heater.
Attention: Please put the gloves on your hands to take the PCB after soldering because the
PCB is heated on the machine. Do not go near the conveyor system when operation to
avoid injury.
4.2.2 Start and Exit
Turn on the main switch of power and switch on the computer to make the machine run.
The system will go into the main window and the machine is in the state of solder melting. The
user can operate them as requirement.
Shoot Exit Menu to exit from the existing system