ECO ARC 600
5-10
Revision 1/10/08
5.5
Further instructions
•
Before starting work each day check that all safety measures and
precautions for thermal spraying have been taken.
•
Check personal protective equipment each day before starting
work.
•
Check the production parameters.
•
For coating larger, joined surfaces it is an advantage to exchange
the standard round stream system for a flat spray system.
•
Please seek our advice.
•
Perform functional monitoring of the machine each day.
•
The hose and cable set should not be kinked. Lay out in large
loops only.
•
Ensure spray wire is clean and dust-free.
•
Check the quality of the compressed air.
•
Empty the condenser daily.
•
Check the oil level and delivery of the oiler weekly.
Top up only with suitable oil.
•
If the compressed air contains large amounts of oil and water, this
condensate will also reach the oiler and adversely affect the air
motor oil. The oil must then be changed.
Summary of Contents for ECO ARC 600
Page 6: ......
Page 47: ...ECO ARC 600 5 1 Revision 1 10 08...
Page 74: ...ECO ARC 600 7 6 Revision 1 10 08...
Page 75: ...ECO ARC 600 8 1 Revision 1 10 08...
Page 88: ...ECO ARC 600 8 14 Revision 1 10 08 T2 K1 A10 F4 D10 F2 1 F2 2 F3 K3 F21 F22 F23...
Page 94: ...ECO ARC 600 9 2 Revision 1 10 08 9 2 Circuit diagram...