Maintaining the iGo neo
This section contains all of the information re-
quired for maintaining the iGo neo. Mainte-
nance must be performed in accordance with
the points in the maintenance checklist. This is
the only way guarantee that the truck remains
ready for operation; it is also a pre-condition
for any warranty claims.
Maintenance schedule
Maintenance tasks on the components for the
Assistance
mode of the iGo neo must be
performed in addition to the scheduled main-
tenance of the series-production truck.
The intervals are defined for standard use.
Shorter maintenance intervals can be defined
in consultation with the operating company,
depending on the application conditions of the
truck.
The following factors may necessitate shorter
maintenance intervals:
●
Dirty, poor-quality roadways
●
Dusty or salty air
●
High levels of air humidity
●
Extremely high or low ambient tempera-
tures, or extreme changes in temperature
●
Multi-shift operation with a high duty cycle
●
National regulations for the truck or for indi-
vidual components
Responsibility for maintenance
DANGER
Work performed by unauthorised persons on com-
ponents used for
Assistance
mode jeopardises
the safety functions of the truck.
To maintain components used for
Assistance
mode, contact the authorised service centre.
Maintenance work on components used for
Assistance
mode must only be performed
by the service centre authorised by the manu-
facturer.
The service engineer must have received spe-
cial training from the manufacturer regarding
the handling processes, technology and repair
work involved with the iGo neo. It is not
Maintenance
8
Maintaining the iGo neo
106
50108046112 EN - 07/2020 (03)
Summary of Contents for OPX 20
Page 2: ......
Page 9: ...1 Foreword ...
Page 27: ...2 Safety ...
Page 42: ...Safety 2 Labelling points 34 50108046112 EN 07 2020 03 ...
Page 43: ...3 Components of the iGo neo ...
Page 62: ...Components of the iGo neo 3 Remote control 54 50108046112 EN 07 2020 03 ...
Page 63: ...4 Operating the iGo neo ...
Page 103: ...5 Storage ...
Page 105: ...6 Cleaning ...
Page 109: ...7 Transport ...
Page 113: ...8 Maintenance ...
Page 118: ...Maintenance 8 Maintenance 1000 hours yearly 110 50108046112 EN 07 2020 03 ...
Page 119: ...9 Technical data ...
Page 138: ......
Page 139: ......