ASTOFLO PLUS ECO Instructions for Use
12 Maintenance
46
Test 1
Visual inspection
Required
Actions
Check the following items:
Complete and legible labeling.
No damage to the housing.
Front panel in good condition. (Since the front panel prevents
fluid from entering the unit, it is important that its full surface
adheres securely to the housing.)
No defects in the power supply cord and mains connector
insulation, with clean and non-corroded contacts.
Test 2
Protective earth resistance
Required
Actions
Measure the resistance between the ground pin on the power plug
and the connector for potential equalization, located on the rear
side of the housing.
For detailed information performing this test see
chapter 12.2 Set
up for electrical safety tests
Result
The test is successful when the limits are met in accordance with
the test protocol.
Test 3.1
Optional to
test 3.2
Earth leakage current (direct method)
Required
Actions
Measure the maximum earth leakage current (PE open). Measure
all combinations of line polarity with neutral open (single fault
condition) and closed (normal condition).
For detailed information performing this test see
chapter 12.2 Set
up for electrical safety tests
Result
The test is successful when the limits are met in accordance with
the test protocol.
Test 3.2
Optional to
test 3.1
Equipment leakage current (alternative method)
Required
Actions
Measure the current flowing from protective earthed conductor and
applied part to the two (shorted) power supply connections.
For detailed information performing this test see
chapter 12.2 Set
up for electrical safety tests
Result
The test is successful when the limits are met in accordance with
the test protocol.