Installation Verification
Operator Manual
122993-622
2.1 Installation
Checklist
INSTALLATION VERIFICATION
After washer has been installed by qualified service technicians, complete the
following checklist to help ensure the installation is complete and correct.
Contact STERIS and schedule a technician to test the installation and demon-
strate proper equipment operation.
❑
Disconnect switches (not provided by STERIS) capable of being locked in
OFF position only for maintenance purposes, installed in electrical supply
lines near unit and in compliance with local occupational health and safety
regulations, as well as electric and plumbing codes for any special require-
ments that may pertain to installation of this unit.
❑
Shutoff valves (not provided by STERIS) capable of being locked in OFF
position only for maintenance purposes, installed on steam and water lines
and in compilance with local occupational health and safety regulations, as
well as electric and plumbing codes for any special requirements that may
pertain to installation of this unit.
NOTE: If the washer is installed next to other equipment, shutoff valves and
disconnect switch should be placed so service can be shut off to any one unit.
❑
Washer positioned, as shown on equipment drawing, with required service
clearance space and in relation to building supply lines.
❑
Building steam line provides maximum dynamic steam pressure and flow
rate to washer as specified on equipment drawing.
❑
Building hot water line supplies water to washer at pressure and temperature
specified on equipment drawing.
❑
If applicable, building cold water line supplies water to washer at pressure
specified on equipment drawing.
❑
If applicable, building pure water line supplies water to washer at pressure
specified on equipment drawing.
❑
Electrical supply for washer is as specified on equipment drawing.
❑
Condensate return is sized as specified on equipment drawing.
❑
Vent connections are sized as specified on equipment drawing.
❑
Wash pump pressure is within 25 to 60 psig.
❑
Proper supply and injection hoses are connected to wash pump.
❑
Rinse pump pressure is within 25 to 60 psig.
❑
Proper chemical supply and injection hoses are connected to rinse pump.
❑
Self-cleaning screen assembly functioning properly.
❑
All piping is leak-free.
❑
Wash section generates a small overflow.
❑
Rinse section generates a small overflow.
❑
Pre-wash spray correctly adjusted (approximately twelve inches above
conveyor belt).
❑
Hydraulic hold-down system correctly balanced.