Table 4-1. Preventive Maintenance Schedule for Amsco 3085 SP Surgical Table
Service Required
Minimum
Frequency
1.0 PREPARATION FOR PREVENTIVE MAINTENANCE
1.1 Discuss equipment operation with department personnel.
Each Inspection
1.2 Remove pads. Examine pad covers and fastening strips (pads and table).
Each Inspection
1.3 Examine clamps and other side rail hardware
.
Tighten all visible screws on side rails.
1 x per year
1.4 Perform overall visual inspection of table, hand control and power cord.
Each Inspection
1.5 Check X-Ray tops for standoffs tightness and signs of cracking.
2 x per year
1.6 Verify cap shroud integrity.
2 x per year
1.7 Unfasten and remove table shrouds and base cover.
Each Inspection
2.0 HYDRAULIC SYSTEM
2.1 Check hydraulic oil level.
1 x per year
2.2 Inspect floor directly beneath table and all hoses, fittings and components of hydraulic
system for evidence of oil leaks.
1 x per year
3.0 CASTERS AND FLOOR LOCKS
3.1 Clean and inspect casters.
2 x per year
3.2 Check floor-lock mechanism for proper operation. Have qualified Service Technician
adjust if needed.
1 x per year
3.3 Inspect table stability with floor locks engaged and on casters.
1 x per year
3.4 Check pin and foot assemblies. Replace as needed.
1 x per year
3.5 Verify all foot pads are present.
2 x per year
4.0 CONTROLS
4.1 Using hand control and/or optional foot control, check table positioning.
2 x per year
5.0 ELECTRICAL CHECKS
5.1 Ensure all circuit board connectors and cable plugs are tight.
1 x per year
5.2 Check all cables for damage or fraying.
1 x per year
5.3 Inspect electrical cord and hand control cable.
2 x per year
5.4 Check operation of circuit breaker CB-2 with table using battery power.
2 x per year
5.5 Verify operation of Auxiliary (Override) Control System.
2 x per year
5.6 Verify condition of batteries and battery charger status.
1 x per year
5.7 Measure voltage of both batteries. Difference in readings must be less than 0.2 V.
Perform articulations for at least two minutes. Voltage must not drop more than 0.6 V. Wait
two minutes and verify voltage has risen by 0.3 V at most. Supply 120 V and ensure voltage
rises above 28 V.
1 x per year
Summary of Contents for Amsco 3085 SP
Page 1: ...MAINTENANCE MANUAL Amsco 3085 SP Surgical Table After S N B420702 025 10 07 10 P764332 897 ...
Page 3: ...OPERATOR MANUAL Amsco 3085 SP Surgical Table 08 10 11 P150830 353 ...
Page 56: ......
Page 132: ......
Page 155: ...18 764332 899 Figure 5 AC Plate Assembly 1 7 3 4 5 6 2 9 10 P17 ...
Page 161: ...24 764332 899 Figure 8 Column Assembly 1 2 3 4 5 6 7 8 9 ...
Page 176: ...40 764332 899 Figure 15 Leg Section Assemblies 1 7 2 4 3 5 6 ...
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......