Figure 2.6.2b
2.6.3
Adjusting Level for Tram
1.
Mount the .0001” test indicator to the spindle nose and sweep the table with a 12” span (6”
radius).
2.
If the tram measurement is not .0008 TIR on the TMC7 and TMC10, adjust the R3 and L3
leveling bolts to adjust the tram within specification. This will tend to help adjust any error you
have in the X and Y axis for the tram. By adjusting these bolts, you can in affect slightly affect
the column and bring in the tram.
3.
If the tram measurement is not .0008 TIR on the TMC5, adjust the R2 and L2 leveling bolts to
adjust the tram within specification. This will tend to help adjust any error you have in the X and
Y axis for the tram. By adjusting these bolts, you can in affect slightly affect the column and
bring in the tram.
4.
If the tram measurement is not .0008 TIR on the TMC12 and TMC14, adjust the C2, L4 and R4
leveling bolts to adjust the tram within specification and not necessarily having equal pressure.
This will tend to help adjust any error you have in the X and Y axis for the tram. By adjusting
these bolts, you can in slightly affect the column and bring in the tram.
5.
Once complete, lock all leveling screws in place with the lock nuts. See figure 2.6.2a