11
English English
Preliminary operations
English
Inside
Outside
Outside
Receiving cell
Receiving cell
40 cm
Transmitting cell
Transmitting cell
4
4
4
4
Top view
Front view
n
safety Instructions
These safety instructions must be followed throughout the whole installation process:
• Remove your jewellery (including bracelets and chains) during installation.
• When drilling and soldering, wear special goggles and appropriate protection.
• Use appropriate tools, as specified on page 2.
• Handle the motorisation system with caution to avoid injury.
• Do not connect the motor to the mains or the (optional) backup battery until the mounting
process has been completed.
• Never use a high-pressure water flow rate for cleaning.
Running a duct into the gateposts
2
1
3
4
l
Photocells
(optional)
The photocells are necessary for automatic-mode operation and for gates opening onto the
public highway.
• Wiring the photocells
(see page 36)
The 24-V input and information received from the contacts (receiving cell) must be
under the cells.
Drill the gateposts to pass the ducts through them.
4
Summary of Contents for SGA 6000
Page 1: ...MOTOR DRIVES FOR LEAF GATES SGA 6000 SGA 6000 INT GRAL SGA 6000 INT GRAL...
Page 3: ......
Page 4: ......
Page 6: ...2 M10 x4 x4 x8 x8 M10 x 150 M6 x 40 M6 HM10 x8 HM6 x4 5 7 8 5 7 8 Not included in the kit...
Page 38: ...34 34 Accessories Description and connections n Section des c bles par type d accessoire TX RX...