Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 212 -
SMA Regelsysteme GmbH
Name Unit
Min.
Max.
Default
Description
If an “ecopower Mini-BHKW” is installed, this
equals the sum of the Sunny Island’s power and
the power of the CHP unit, as received from by the
Sunny Island on its COM3 port.
Pext L1
kW
-320
320
0
Generator active power phase 1
Pext L2
kW
-320
320
0
Generator active power at phase 2
Pext L3
kW
-320
320
0
Generator active power at phase 3
Iext Sum
A
0
640
0
Sum of generator current (three phases)
Psi L1
kW
-320
320
Grid active power of Sunny Island phase 1
Psi L2
kW
-320
320
Grid active power of Sunny Island phase 2
Psi L3
kW
-320
320
Grid active power of Sunny Island phase 3
Bat State
L4
O3
L1
Current battery state
0: L4
deep-cycle discharge
1: L3
2: L2
3: L1
4: N4
5: N3
6: N2
7: N1
battery full
8: O1
overcharge
9: O2
10: O3
SOC act
%
-100
110
0
Actual battery state of charge
Pbat Sum
W
-32000 32000
0
Sum of battery power SI (three phases)
Ibat Sum
A
-320
320
0
Sum of battery current SI (three phases)
GenState
0
10 0
Generator
state
0: none
not active
1: off
off
2: glow
glowing up
3: crank
cranking
4: warm
warming up
5: run
running
6: cool
cooling down
7: Stop
stopping
8: lock
locked after operation
9: fail
failure
10: fail_look
locked after multiple failure