Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 206 -
SMA Regelsysteme GmbH
„PARALL“ (3+9)
Parameter Unit
Min.
Max.
Default
Description
operation.
8: SYNC_HDTK: Relay is switched during any
transfer from grid-tied to grid-
forming operation or vice versa.
9: Reserved:
10: LOAD:
Relay is switched in relation to
load (see also parameter 625
to 630)
707_Man K7
(A)
0
2
0
Operating mode of relay K7
0: OFF:
Switch relay K7 off
1: ON:
Switch relay K7 on
2: AUTO:
Sunny Island automatically con-
trols relay K7.
708_Man K8
(A)
0
2
0
Operating mode of relay K8
0: OFF:
Switch relay K8 off
1: ON:
Switch relay K8 on
2: AUTO:
Sunny Island automatically con-
trols relay K8.
710_K1 t2 begin
(C)
h
0
23
0
Start of special period t2 for K1
711_K1 t2 end
(C)
h
0
23
0
End of special period t2 for K1
712_K1 On t1
(D)
0
10
4
When this battery state is reached, K1 is switched
on.
0: L4
deep-cycle discharge
1: L3
2: L2
3: L1
4: N4
5: N3
6: N2
7: N1
Battery full
8: O1
Overcharge
9: O2
10: O3