Equipment Manual, 09/2022, L1V30415168B-03
53
Commissioning
6
6.1
Overview
Prerequisites
•
The device has been installed.
•
The device has been connected in accordance with the possible connection methods.
•
Ethernet connection has been established.
Steps for starting up the device
1.
Apply the supply voltage
2.
Parameterize the device using the powerconfig software
3.
Apply the measuring voltage
4.
Apply the measuring current
5.
Check the measured values using the powerconfig software
Note
Check the connections.
Incorrect connection can result in malfunctions and damage to the device.
Before starting up the PAC3200T, check that all connections are correct.
Note
When performing an insulation test of the entire installation with AC or DC, the device should
be disconnected before starting the test.
Summary of Contents for SENTRON PAC3200T
Page 1: ......
Page 2: ......
Page 8: ......
Page 14: ......
Page 30: ......
Page 46: ......
Page 54: ......
Page 74: ......
Page 88: ......
Page 89: ...Equipment Manual 09 2022 L1V30415168B 03 87 Dimensional drawings 9 Frame dimensions ...
Page 90: ......
Page 134: ...Equipment Manual 09 2022 L1V30415168B 03 132 ...
Page 135: ......
Page 136: ......