3-14
3
9.
Adjust the shift cable joint
5
, and then
install the shift cable joint
5
to the pin
f
.
WARNING! The shift cable joint must
be screwed in 8.0 mm (0.31 in) or
more.
10. Install the clip
7
, and then tighten the
shift cable locknut
8
to the specified
torque.
11. Fully screw in the throttle cable joint
9
to
the throttle cable
4
.
12. Pull the inner cable so that there is no
free play (backlash).
13. Check that the throttle cam
0
contacts
the stopper
A
.
14. Adjust the throttle cable joint
9
, and then
install the throttle cable joint
9
to the pin
h
of the throttle cam.
WARNING! The
throttle cable joint must be screwed in
8.0 mm (0.31 in) or more.
15. Install the clip
B
, and then tighten the
throttle cable locknut
C
to the specified
torque.
16. Check the shift cable and throttle cable
for proper operation.
Dimension
g
: 8.0 mm (0.31 in) or more
Shift cable locknut
8
:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
c
b
b d
b d
e
5
5
f
g
8
7
Dimension
k
: 8.0 mm (0.31 in) or more
Throttle cable locknut
C
:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
4
9
A
0
9
9
k
h
C
B
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......