8-50
8
4.
Install the dowels
5
.
5.
Install the lower unit to the upper case,
and then tighten the bolts
6
to the speci-
fied torque.
TIP:
Make sure that the cooling water pipe
7
is
inserted securely into the cover
8
.
6.
Connect the speedometer hose
9
.
7.
Turn the adjusting nut
0
to connect the
shift rods
A
and
B
, and then tighten the
locknut
C
.
TIP:
The adjusting nut
0
must be screwed in 8.0
mm (0.31 in)
a
or more.
8.
Install the anode
D
and trim tab
E
.
TIP:
Install the trim tab in the original position.
9.
Install the washer
F
, propeller
G
,
washer
H
, and bushing
I
. Place a block
of wood between the anti-cavitation plate
and propeller to keep the propeller from
turning, and then tighten the propeller nut
J
to the specified torque.
10. Install a new cotter pin
K
.
Extension nut
4
:
39 N·m (3.9 kgf·m, 28.8 ft·lb)
Lower case mounting bolt (M10)
6
:
39 N·m (3.9 kgf·m, 28.8 ft·lb)
6
6
5
5
7
A
8
572
LT
572
LT
1901
518
0
a
C
9
A
B
Propeller nut
J
:
34 N·m (3.4 kgf·m, 25.1 ft·lb)
572
LT
E
D
D
G
J
I
H
F
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......