5-31
ELEC
Electrical system
3.
Check the PTT switch for continuity.
Replace if out of specification.
4.
Disconnect the PTT relay coupler
e
.
5.
Remove the fuse
1
.
6.
Check the wiring harness for continuity.
7.
Install the fuse
1
.
8.
Connect the PTT relay coupler
e
and
PTT switch coupler
a
.
Switch
position
Terminal
b
c
d
Up
Free
Down
c
d
b
Lg
R
Sb
c
d
b
e
20
1
Wiring harness continuity:
a
Terminal 1–
e
Terminal 1
a
Terminal 2–
e
Terminal 2
a
Terminal 3–Terminal
f
1
2
3
1
2
a
e
f
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......