7-17
POWR
Power unit
11. Remove the power unit. See steps 11–17
in “Removing the power unit (remote
control model)” (7-14).
Installing the power unit (remote
control model)
Make sure to install the shift rod and shift link
onto the bottom cowling before installing the
power unit. See “Shift link and shift rod” (9-
11).
Do not reuse a gasket, always replace it
with a new one.
1.
Clean the power unit mating surface, and
then install the dowels
1
and a new gas-
ket
2
.
2.
Install the power unit
3
, and then tighten
the bolts
4
to the specified torque in 2
stages and in the order
1
,
2
, and so on.
TIP:
Tighten the bolts to the same torque in both
stages.
3.
Install the driven sprocket cover
5
and
oil dipstick
6
.
4.
Install the apron
7
, and then tighten the
screw
8
to the specified torque.
1901
4
2
LT
572
LT
1
3
Power unit mounting bolt
4
:
1st: 21 N·m (2.1 kgf·m, 15.5 ft·lb)
2nd: 21 N·m (2.1 kgf·m, 15.5 ft·lb)
Apron screw
8
: 2 N·m (0.2 kgf·m, 1.5 ft·lb)
STBD
PORT
4
5
1
7
6
2
3
9
8
4
4
Front
Front
Front
6
5
7
8
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......