7-18
7
5.
Connect the fuel hose
9
, and then slide
the clamp
0
up.
6.
Connect the cooling water hose
A
to the
exhaust cover, and then install the holder
B
to the bracket
C
.
7.
Install the shift link
D
to the power unit.
TIP:
Before installing the shift link
D
, make sure
that the shift rod
E
is connected properly.
8.
Connect the PTT switch coupler
a
. (PTT
model)
9.
Connect the alert indicator coupler
b
.
10. Connect the PTT motor leads
c
, and
then fasten the PTT motor leads using
the holder
F
. (PTT model)
11. Install the plastic tie
G
and caps
d
. (PTT
model)
12. Install the PTT relay cover
H
, and then
tighten the screws
I
to the specified
torque. (PTT model)
13. Connect the battery lead connector
e
,
and then fasten the battery lead
f
and
main wiring harness using the holders
J
and
K
.
9
0
C
B
A
D
D
E
PTT relay cover screw
I
:
3 N·m (0.3 kgf·m, 2.2 ft·lb)
a
b
G
H
F
d
c
I
I
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......