7-9
POWR
Power unit
TIP:
• Tie a knot in both ends
a
and
b
of the
starter rope
0
.
• Make sure to leave 12.0–20.0 mm (0.47–
0.79 in)
c
at the end
b
of the starter rope
0
.
4.
Wind the starter rope
0
twice around the
sheave drum
B
counterclockwise.
TIP:
After winding the starter rope
0
around the
sheave drum
B
, fit the starter rope into the
slot
d
.
5.
Install the spiral spring
C
.
WARNING!
The spiral spring can pop out. Cover
the spiral spring with rags when
installing it.
TIP:
Hook the end
e
of the spiral spring
C
onto
the protrusion
f
on the manual starter cover
D
.
6.
Install the sheave drum
B
, and then turn
it to fit the end
g
of the spiral spring
C
into the slot
h
.
7.
Install drive pawl spring 1
E
and the
drive plate
F
, and then tighten the screw
G
to the specified torque.
Sheave drum screw
9
:
3.4 N·m (0.34 kgf·m, 2.51 ft·lb)
8
0
9
b
A
6
7
a
c
E
LT
271
B
0
d
0
B
C
D
e
f
B
C
h
g
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......