5-27
ELEC
Electrical system
8.
Install the bracket
B
.
9.
Install the magnet switch
C
and cap
g
.
Installing the starter motor
1.
Install the starter motor to the power unit.
See “Starter motor” (7-32).
Charging unit and components
Checking the lighting coil
1.
Remove the manual starter. See
“Removing the manual starter” (7-7).
(Manual starter model)
Remove the flywheel magnet cover.
(Electric starter model)
2.
Disconnect the lighting coil coupler
a
,
and then connect the special service tool
1
.
3.
Measure the lighting coil output peak
voltage.
A
4
f e
B
C
LT
242
g
Test harness (2 pins)
1
: 90890-06887
Lighting coil output peak voltage:
Green (G)–Green (G)
r/min
Unloaded
Cranking
1500
3500
DC V
11.5
25.7
61.6
B
R
G
G
1
1
a
b
b
a
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......