Page 7.22
7.0 Soldering profile management and production
Profile management 551.19 \ 12.2015 \
Start production
Heat-up phase
Start system
After adjusting a suitable soldering or curing profile you can prepare
the production.
The following requirements must be fulfilled to start the production:
a suitable soldering or curing profile is loaded,
The working width of the pin chain conveyor is adjusted (option)
the system has heated up,
the ready status is shown on the display.
y
Turn on the soldering system with the main switch. After
turning on the system will load the last used soldering pro-
gram automatically. If you don't want to use this program
then load another stored program.
y
Press the key
<Start system>
.
Starting the system will turn on the heating, the motor for the
conveyor and the PCB detection by light reflex scanner at the
inlet. The operating status will change to HEATING and will be
shown in the status message on the system screen.
The system screen shows additionally a signal light which lights
yellow during the heat-up phase.
Summary of Contents for 551.10
Page 2: ......
Page 10: ...Table of content Table of content 551 19 12 2015 Page 0 10 ...
Page 32: ...Page 3 4 3 0 Warranty Warranty 551_19 12 2015 ...
Page 42: ...4 0 Technical data Page 4 10 Technical Data 551_15 04 2015 ...
Page 54: ...4 0 Technical data Page 4 22 Technical Data 551_15 04 2015 ...
Page 56: ...4 0 Technical data Page 4 24 Technical Data 551_15 04 2015 ...
Page 58: ...4 0 Technical data Page 4 26 Technical Data 551_15 04 2015 ...
Page 78: ...Page 6 4 6 0 Function and start up Function 551 19 12 2015 ...
Page 80: ...Page 6 6 6 0 Function and start up Function 551 19 12 2015 ...
Page 90: ...Page 6 16 6 0 Function and start up Function 551 19 12 2015 Menu structure Edit program ...
Page 92: ...Page 6 18 6 0 Function and start up Function 551 19 12 2015 Menu structure Save program ...
Page 100: ...Page 6 26 6 0 Function and start up Function 551 19 12 2015 Menu structure Setup ...
Page 102: ...Page 6 28 6 0 Function and start up Function 551 19 12 2015 ...
Page 134: ...8 0 System settings Page 8 2 System_settings 551 19 12 2015 ...
Page 142: ...8 0 System settings Page 8 10 System_settings 551 19 12 2015 ...
Page 144: ...8 0 System settings Page 8 12 System_settings 551 19 12 2015 ...
Page 208: ...Page 9 60 9 0 Maintenance and service Maintenance 551_15 11 2014 ...
Page 220: ...11 0 Options and spare parts Optionen 551_19 12 2017 Page 11 12 Server software setup ...
Page 222: ...11 0 Options and spare parts Optionen 551_19 12 2017 Page 11 14 Create user ...
Page 224: ...11 0 Options and spare parts Optionen 551_19 12 2017 Page 11 16 ...
Page 226: ...11 0 Options and spare parts Optionen 551_19 12 2017 Page 11 18 Set up external operation ...
Page 230: ...11 0 Options and spare parts Optionen 551_19 12 2017 Page 11 22 ...
Page 233: ...Page 12 1 12 0 Notes ...
Page 234: ...12 0 Notes Page 12 2 ...
Page 235: ...Page 12 3 12 0 Notes ...
Page 236: ...12 0 Notes Page 12 4 ...
Page 237: ...Page 12 5 12 0 Notes ...
Page 238: ...12 0 Notes Page 12 6 ...