062AZ005A
8
MAINTENANCE
8-2
8.1
ROUTINE MAINTENANCE
8.1.1
ROUTINE MAINTENANCE TABLE
Unit and intervention point
(3)
Action taken
Every X hours
Lubricant
Time (min) (2)
When deemed
necessary
.
180
360
720
(1 month)
1440
(2 months)
2160
(3 months)
4320
(6 months)
8640
(1 year)
12960
(18 months)
25920
(3 years)
(4)
Type
(1)
Q.ty
PNEUMA
TIC SYSTEM
Condensate bottle
Drain
•
1
System
8.1.2.4
Clean filter
•
5
Clean silencers/change
•
5
VISION SYSTEM
Lenses, focus lenses, mirrors
8.1.2.1
Check and clean, if necessary
•
5
Touch-screen monitor (5)
Clean
•
1
CONVEYOR BEL
T
Belt (5)
8.1.2.2
Clean
•
See
ADJUSTMENTS
Check for wear and tear
•
5
8.1.2.3
Replace, if necessary
•
60
Slide surface slots
Clean
•
5
DRIVE UNIT
Encoder
Check wear and tear
•
5
(1) Refer to the
ADHESIVES
AND LUBRICANTS DA
TA
SHEET
supplied under separate cover
.
(2) Estimated machine downtime required to perform the operation.
(3) Refer to the paragraphs that deal with the operation.
(4) Contact SACMI customer service before attempting to perform operations for additional information.
(5)
The actual duration is strictly related to the work conditions.
º
Symbol indicating the time interval for the first maintenance job, if dif
ferent from the one indicated with symbol
•
.
Summary of Contents for Imola CHS Series
Page 2: ......
Page 4: ...062AZ005A...
Page 48: ...062AZ005A 2 FEATURES 2 32...
Page 76: ...062AZ005A 4 INSTALLATION 4 10...