
SRG-4500 User Guide (v7.0)
Installing the Breakout PCB • 123
Installing the Breakout PCB
The Breakout PCB for the SRG-4500 enables you to cable a Primary SRG-4500 and a Backup SRG-4500 to an
ACO-4500 but still retain access to the AES, DARS, and Analog Audio connections on balanced 3-pin connectors.
Installing the Breakout PCB requires:
1. Installing the Breakout PCB on the Rack Tray
2. Installing the Breakout PCB into the Rack Frame
3. Connecting the Breakout PCB to the SRG-4500
4. Cabling the Connectors on the Breakout PCB
Before You Begin
Before installing the Breakout PCB, refer to the document “
Important Regulatory and Safety Notices to Service
Personnel
” that accompanied your unit for general safety information.
Static Discharge
Throughout this manual, please heed the following cautionary note
Unpacking
Unpack each SRG-4500 Install Kit you received from the shipping container and ensure that all items are included.
If any items are missing or damaged, contact your sales representative or Ross Video directly.
Required Equipment
summarizes the items that are required
Installing the Breakout PCB on the Rack Tray
You will need a Phillips screwdriver to affix the Breakout PCB to the rack tray using the four M3 10mm screws that
were included in the SRG-4500 Install Kit.
For More Information on...
• installing the rear support brackets into the rack frame, refer to the section “
ESD Susceptibility
— Static discharge can cause serious damage to sensitive semiconductor
devices. Avoid handling circuit boards in high static environments such as carpeted areas and when
synthetic fiber clothing is worn. Always exercise proper grounding precautions when working on circuit
boards and related equipment.
Table 13.1 SRG-4500 Install Kit Items
Part Number
Description
Quantity
70-00994
Rack frame tray for the Breakout PCB
1
8399AR-032
Breakout PCB
1
4101-3004-RC
M3 5mm screws for the rear brackets and tray
8
88-00995
M3 10mm screws with lock washers
4
4500CR-100
30-pin Molex cable (red and violet wires)
1
Summary of Contents for 4500DR-104-07
Page 1: ...SRG 4500 User Guide...
Page 12: ...viii Contents SRG 4500 User Guide v7 0...
Page 20: ...20 Before You Begin SRG 4500 User Guide v7 0...
Page 38: ...38 Functional Check Procedures SRG 4500 User Guide v7 0...
Page 42: ...42 Getting Started SRG 4500 User Guide v7 0...
Page 92: ...92 Front Panel Menu System SRG 4500 User Guide v7 0...
Page 100: ...100 Troubleshooting SRG 4500 User Guide v7 0...
Page 128: ...128 4K UHD BNC Connections SRG 4500 User Guide v7 0...
Page 154: ...154 PTP Option SRG 4500 User Guide v7 0...
Page 160: ...160 Service Information SRG 4500 User Guide v7 0...