![Rohde & Schwarz ZVB 4 Manual Download Page 115](http://html.mh-extra.com/html/rohde-and-schwarz/zvb-4/zvb-4_manual_1477900115.webp)
Troubleshooting R&S
ZVB
1145.1078.82 3.58
E-1
Board Test
When boards are being tested, internal sources are used whenever possible. This means that it is
always assumed that the downstream board in the signal path is OK. If a clear fault is not present, the
order of the board tests given below should always be followed.
The inputs and outputs of the boards to be tested can be accessed via cables in the lower section of the
instrument (except the frequency reference board).
Opening the instrument
(See Chapter 5, drawing1145.1010)
¾
Turn off the instrument and disconnect from the mains, screw off the 4 rear-panel feet (460) and
pull off the enclosure (400) backwards.
¾
Remove the instrument base cover (297) after undoing the 12 countersunk screws (299).
Only when testing the frequency reference board:
¾
Lift off the instrument top cover (296) after undoing the 23 (2 ports) or the 28 (4 ports) countersunk
screws (298).
Summary of Contents for ZVB 4
Page 57: ...Instrument Construction and Function Description R S ZVB 1145 1078 82 I 3 2 E 1 ...
Page 133: ...1145 1078 82 5 5 E 1 Spare Parts List Mechanical Drawings ...
Page 142: ...1145 1078 82 5 15 E 1 Block Circuit Diagram ...
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ...1145 1078 82 5 17 E 1 Circuit diagrams ...
Page 154: ......
Page 155: ......
Page 156: ......