![Rohde & Schwarz ZNLE Series Getting Started Download Page 35](http://html.mh-extra.com/html/rohde-and-schwarz/znle-series/znle-series_getting-started_1477894035.webp)
Instrument Tour
R&S
®
ZNLE
35
Getting Started 1323.2873.02 ─ 08
1
3
5
7
6
2
4
Figure 4-3: Rear panel view
1 = AC power supply connection and main power switch
2 = GPIB ("IEC") interface
3 = Reference clock connectors
4 = Trigger input connector
5 = "DVI" connector for external display
6 = "LAN" connector
7 = "USB" (3.0) connectors
The meanings of the labels on the R&S
ZNLE are described in
4.2.1
AC Power Supply Connection and Main Power Switch
An AC power supply connector and main power switch are located in a unit on
the rear panel of the instrument.
Main power switch function:
Position 1: The instrument is in operation.
Position O: The entire instrument is disconnected from the AC power supply.
For details, refer to
Rear Panel View