
Preparing for Use
R&S
®
ZNLE
16
Getting Started 1323.2873.02 ─ 08
To connect the AC power
1. Plug the AC power cable into the AC power connector on the rear panel of the
instrument. Only use the AC power cable delivered with the R&S
ZNLE.
2. Plug the AC power cable into a power outlet with ground contact.
The required ratings are listed next to the AC power connector and in the data
sheet.
For details on the connector, refer to
Chapter 4.2.1, "AC Power Supply Connec-
3.6
Switching On or Off
Table 3-1: Overview of power states
Status
LED on Power key Position of main power switch
Off
gray
[0]
Standby
orange
[I]
Ready
green
[I]
To switch on the R&S
ZNLE
The R&S
ZNLE is off but connected to power.
1. Set the switch on the power supply to position [I].
Chapter 4.2.1, "AC Power Supply Connection and Main Power Switch"
on page 35.
The LED of the Power key is orange.
See
2. Press the Power key.
The LED changes to green.
Switching On or Off