![Rice Lake IDIMENSION 200 Installation Manual Download Page 26](http://html1.mh-extra.com/html/rice-lake/idimension-200/idimension-200_installation-manual_1453986026.webp)
Calibration
23
9. Click
Save
.
iDimension 300
will request confirmation of the save action.
Figure 3-21. Save the Changes
10. Click
OK
to save the changes or
Cancel
to abandon saving the changes.
3.3
Test Changes
Use the Demo application to test the changes.
1. Return to the QubeVu Manager main menu.
2. Select
Displays
.
Figure 3-22. Select Demo from the QubeVu Manager Main Menu
3. Select
Demo Displays
.
4. Place an item on the
iDimension 300
platform or onto the scale to test that the device is operating correctly.
Figure 3-23. Place an Item on the iDimension 300 Platform or onto the Scale
Congratulations!
iDimension 300
is now ready to use.
Summary of Contents for IDIMENSION 200
Page 2: ...iDimension 300 Industrial Installation Manual PN 169040...
Page 3: ......
Page 15: ...12 iDimension 300 6 Click Done to save the settings...
Page 35: ...32 iDimension 300 General Settings Figure 5 10 iDimension 300 General Settings Main Menu...
Page 69: ...66 iDimension 300...
Page 70: ...Administrator s Section 67...
Page 71: ......