![Rice Lake IDIMENSION 200 Installation Manual Download Page 20](http://html1.mh-extra.com/html/rice-lake/idimension-200/idimension-200_installation-manual_1453986020.webp)
Calibration
17
10. Hold down the left mouse button and drag the mouse to draw a rectangle around the calibration object.
Figure 3-9. Draw a Rectangle around the Calibration Object
11. Press
Calibrate
.
Figure 3-10. Camera Calibration
12. All three tabs must show the green check mark for the calibration to be successful. Review each tab to
ensure that the calibration object was successfully captured and no other object has mistakenly been placed
in the view of the cameras.
Figure 3-11. Calibration Successful
Summary of Contents for IDIMENSION 200
Page 2: ...iDimension 300 Industrial Installation Manual PN 169040...
Page 3: ......
Page 15: ...12 iDimension 300 6 Click Done to save the settings...
Page 35: ...32 iDimension 300 General Settings Figure 5 10 iDimension 300 General Settings Main Menu...
Page 69: ...66 iDimension 300...
Page 70: ...Administrator s Section 67...
Page 71: ......