Page 22 of 28
Turn the winch handle clockwise, winding the rope coils inward and over the taped rope end covering
the full length of the tape, ensure there is tension on the ropes and the rope coils are tight and together.
Tape over and around the rope coils for the full length of the coils ensuring overlapping of the tape, put
three layers of tape over the coils, as per the diagrams.
Wind the rope inward and over Tape the full length of the coils with three
Routing the winch lines.
Thread the free end of the rope over the rear and middle
crossbars, through the load holder eye, over the front
crossbar, under and around the front roller. Adjust the
front roller sleeves so that the rope is around the sleeve,
as per the diagrams.
Tape roller
full length of
ro
p
e end.
Lay 150 mm of
ro
p
e onto the roller
the tape.
layers of tape.
Summary of Contents for RBLW
Page 1: ...Page 1 of 28 THE BOAT LOADER FITTING INSTRUCTION CONTROLLED...
Page 10: ...Page 10 of 28...
Page 24: ...Page 24 of 28...