![background image](http://html1.mh-extra.com/html/raven/sc1/sc1_calibration-and-operation-manual_3868747040.webp)
CHAPTER 5
36
Raven SC1™/TC1™ Calibration & Operation Manual for Towed Implements
NODE ORIENTATION INFORMATION
FIGURE 6. Node Orientation Information Screen
Use the Node Orientation screen to verify the physical orientation of the SC1/TC1 ECU on the implement. If the
Node Orientation display does not match the actual ECU orientation, the implement profile will need to be
recalibrated to ensure the system properly steers the implement during field operation.
AUX INPUT
FIGURE 7. Aux Input Screen
The Auxiliary Input provides settings and options for an auxiliary device such as the Grayhill Remote. Refer to the
auxiliary device manual for additional assistance with device configuration, features, and options.
Summary of Contents for SC1
Page 28: ...CHAPTER 3 24 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 36: ...CHAPTER 4 32 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 48: ...CHAPTER 5 44 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 54: ...CHAPTER 6 50 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 74: ...CHAPTER 8 70 Raven SC1 TC1 Calibration Operation Manual for Towed Implements...
Page 76: ...Index 72 Raven SC1 TC1 Plough Steering Calibration and Operation Manual...